Showing 1–15 of 34 results
-
AN APPRAISAL OF CAUSES OF DEFECTS IN BUILDINGS CASE STUDY (FACULTY OF ENVIRONMENTAL STUDIES) AMBROSE ALLI UNIVERSITY, EKPOMA
₦3,000.00 GET THE FULL PROJECT -
AN APPRAISAL OF SAFETY AND HEALTH PLANNING ON CONSTRUCTION SITES (A CASE STUDY OF SOME SELECTED SITES IN EKPOMA, EDO STATE)
₦3,000.00 GET THE FULL PROJECT -
AN APPRAISAL OF THE COST MANAGEMENT PRACTICES IN THE DELIVERY OF CAPITAL PROJECTS IN NIGERIA
₦3,000.00 GET THE FULL PROJECT -
AN APPRAISAL OF THE EFFECTIVENESS SUPERVISION ON BUILDING PROJECTS IN EKPOMA, EDO STATE
₦3,000.00 GET THE FULL PROJECT -
AN APPRAISAL OF WASTE MINIMIZATION ON BUILDING CONSTRUCTION SITE
₦3,000.00 GET THE FULL PROJECT -
AN ASSESSMENT OF CONTRACTOR’S RISKS EXPOSURE WITHIN SOME STANDARD FORMS OF BUILDING CONTRACT IN NIGERIA.
₦3,000.00 GET THE FULL PROJECT -
AN ASSESSMENT OF METHODS IN MATERIAL STORAGE AND HANDLING
₦3,000.00 GET THE FULL PROJECT -
AN ASSESSMENT OF RISK FACTORS IN MASONRY AND CARPENTRY WORKS (A CASE STUDY OF SELECTED SITES IN F.C.T ABUJA)
₦3,000.00 GET THE FULL PROJECT -
AN ASSESSMENT OF SAFETY MEASURES ON BUILDING CONSTRUCTION SITE
₦3,000.00 GET THE FULL PROJECT -
AN ASSESSMENT OF THE EFFECTIVENESS OF CORRECTIVE AND ROUTINE MAINTENANCE IN RESIDENTIAL BUILDINGS A CASE STUDY OF UROMI, EDO STATE
₦3,000.00 GET THE FULL PROJECT -
AN ASSESSMENT OF THE USE OF LOCAL BUILDING MATERIALS A CASE STUDY OF EKPOMA, EDO STATE
₦3,000.00 GET THE FULL PROJECT -
AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS IN THE FEDERAL CAPITAL TERRITORY, ABUJA
₦3,000.00 GET THE FULL PROJECT -
ANALYSIS OF DETRACTING FACTORS AFFECTING CONSTRUCTION COSTS IN ENUGU, ENUGU STATE
₦3,000.00 GET THE FULL PROJECT -
ASSESSMENT OF MANAGEMENT OF MASONRY ON CONSTRUCTION SITES
₦3,000.00 GET THE FULL PROJECT -
BUILDING FAILURE AND COLLAPSE IN NIGERIA: THE INFLUENCE OF THE INFORMAL SECTOR
₦3,000.00 GET THE FULL PROJECT