ABSTRACT
Drilling is a process that involves the procurement of natural resources such as oil and gas which holds prime importance in today’s world, Drilling practices abounds with a number of complications and an efficient way of dealing with such problems is key to the continuity of the process.
One of such problems is stuck pipe, stuck pipe is a common problem in the industry and it accounts for major rig time loss known as Non Productive Time (NPT) and also accounts for billions of dollars wasted annually in the petroleum industry.
The purpose of this project to implement a powerful machine learning tool known as the Artificial Neural Network in the prediction of stuck pipe using Niger Delta fields as a case study,
The ANN is a Matlab built in function and computational system inspired by the structure, processing method and learning ability of the human brain.
The ANN has the ability to take multiple inputs ( plastic viscosity, yield point and gel strength at 10 seconds and 10 minutes), a target ( mud weight ) to produce a single output which is the prediction of the occurrence of stuck pipe. This was successfully carried in this research study. It is therefore shown in this study that the ANN can be successfully used to predict the occurrence of stuck pipe. Thus, they can be utilized with real-time data representing the results on a log viewer which can help reduce the occurrence of getting stuck while drilling and all the complications that comes with this occurrence.
TABLE OF CONTENTS
TITLE PAGE ………………………………………………………………………………………………………………….. i
CERTIFICATION ………………………………………………………………………………………………………….. ii
DEDICATION ………………………………………………………………………………………………………………. iii
ACKNOWLEDGEMENT ………………………………………………………………………………………………. iii
ABSTRACT …………………………………………………………………………………………………………………… v
LIST OF FIGURES ……………………………………………………………………………………………………….. ix
LIST OF TABLES ………………………………………………………………………………………………………….. x
CHAPTER ONE …………………………………………………………………………………………………………….. 1
1.0 INTRODUCTION ……………………………………………………………………………………………… 1
1.1.1 Mechanical sticking: ……………………………………………………………………………………. 2
1.1.2 Differential sticking …………………………………………………………………………………….. 3
1.1.3 Freeing stuck pipe ……………………………………………………………………………………….. 6
1.2 Background of Study ………………………………………………………………………………………….. 7
1.3 Aims and Objective ……………………………………………………………………………………………. 8
1.5 Scope of Study ………………………………………………………………………………………………… 10
1.6 Justification …………………………………………………………………………………………………….. 10
1.7 Materials and Methodology ………………………………………………………………………………. 10
CHAPTER TWO ………………………………………………………………………………………………………….. 12
2.0 LITERATUE REVIEW AND THEORITICAL FRAMEWORK …………………………… 12
vii
2.1 Artificial Neural Network …………………………………………………………………………………. 12
2.2 Literature Review …………………………………………………………………………………………….. 16
2.2.1 Stuck pipe prediction using ANN ………………………………………………………………… 16
2.2.2 Analysis and prevention of stuck pipe ………………………………………………………….. 17
2.2.3 Stuck pipe prediction using other tools …………………………………………………………. 19
2.2.4 Stuck Pipe in Niger Delta ……………………………………………………………………………. 20
CHAPTER THREE ………………………………………………………………………………………………………. 21
3.0 MATERIALS AND METHODOLOGY …………………………………………………………….. 21
3.1 Introduction …………………………………………………………………………………………………. 21
3.2 Data Acquisition …………………………………………………………………………………………… 21
3.3 Selection of the parameters …………………………………………………………………………….. 22
3.4 ANN Training ………………………………………………………………………………………………. 24
CHAPTER FOUR …………………………………………………………………………………………………………. 27
4.0 RESULT AND DISCUSSION…………………………………………………………………………… 27
4.1 Experimental Data ………………………………………………………………………………………… 28
CHAPTER FIVE ………………………………………………………………………………………………………….. 36
5.0 CONCLUSION AND RECOMMENDATION ……………………………………………………. 36
5.1 Conclusion ……………………………………………………………………………………………………….. 36
5.2 Recommendation ………………………………………………………………………………………………. 36
STUCK PIPE PREDICION SIMULATIONAND PREDICTION CODES USING ANN …… 41
CHAPTER ONE
1.0 INTRODUCTION
Over several years the petroleum industry has been facing challenges associated with stuck pipe. Stuck pipe has caused a major drilling cost for the drilling industry worldwide and various cost estimates carried out have indicated that the cost of fixing stuck pipe issues exceeds $250 million per year (Bradley et al., 1991).
Problems of stuck pipe can range from minor inconveniences to increase in drilling cost up to major complications which will lead to altered drilling due to the inability to drill when this occurs resulting in major time loss.
A major key to the reduction of this phenomenon is the ability to correctly or even better, accurately predict the occurrence of stuck pipe.
Generally, stuck pipe is described as any restriction of upward or downward movement of drill string and/or pipe rotation and leads to a situation where the pipe cannot be freed from the hole without damaging the pipe, and without exceeding the drill rigs maximum allowed hook load. The portion of the drill string that cannot be rotated or moved vertically is known as the stuck pipe.
There are several causes of stuck pipe which include poor hole cleaning, key sitting, collapsed casing, junk, cement related problems, mobile formation, geo-pressured formation, fractured formation. However, the causes of stuck pipe can be classified under two broad categories which are mechanical and differential sticking.
1.1.1 Mechanical sticking:
This is the limiting or prevention of motion of the drill string by anything other than differential pressure sticking. According to drillers stuck pipe handbook (1997) by Schlumberger, Mechanical Sticking can be caused by the following:
1. Inadequate hole cleaning
2. Formation instability (brittle, sloughing, or swelling shales)
3. Key seating
4. Under gauge hole
5. Tectonically stressed formations
6. Plastic or mobile formations
7. Under pressured formations
8. Junk
9. Ledges and doglegs
10. Collapsed casing/tubing
11. Unconsolidated formations
12. Large boulders falling into the hole
13. Running large gauge tools
14. Cement blocks
15. Green cement
However, most cases of mechanical sticking can be avoided by proper well planning, optimal mud design and right directional planning.
1.1.2 Differential sticking
Differential pipe sticking is one of the stuck pipe mechanisms that have had a major impact on drilling efficiency and well costs (Adams, 1977; Weakley, 1990; Wisnie and Zheiwei, 1994); it is in most drilling organization, the greatest drilling problem worldwide in terms of time and financial cost.
This is a condition whereby the drill string cannot be moved (rotate or reciprocated) along the axis of the wellbore. Differential sticking occurs when high contact force caused by low reservoir pressure, high wellbore pressures, or both, are exerted over a sufficiently large area of the drill string. It is important to note that the sticking force is a product of the differential pressure between the wellbore and the reservoir and the area that the differential pressure is acting upon, this means that a relative low differential pressure (δp) applied over a large working area can be effective in sticking the pipe as can a high differential pressure applied over a small area.
Differential pipe sticking occurs when a part of the drill string, casing, or logging tool becomes embedded in a mud solids filter cake and is held there by a significant amount of differential pressure. This differential pressure is the pressure difference between the hydrostatic pressure of mud and the formation pore pressure. Usually, because of the excessive differential pressure, the sticking takes place across porous and permeable formations such as sandstone or limestone, where a mud filter cake builds up during drilling. It does not occur in very low permeability formations such as shale’s, where mud filter cakes normally do not form. Although these symptoms are similar to Key Seat sticking, they usually occur under different drilling conditions.
Significant mud overbalance, as well as an exposed permeable section, must also exist for differential sticking to occur. It is clear that as many reservoirs become depleted, a significant number of wells will be drilled with high overbalance pressures, thereby maintaining the industry’s concerns over differential sticking (Miri et al., 2007). The likelihood of differential sticking is increased further with the length of the permeable section that is open to the drilling fluid. The continued trend towards extended reach and horizontal drilling means that increasing lengths of permeable formations are exposed. Clearly, the nature of the rock formations encountered certainly cannot be altered. Therefore, if those formations carry a high risk of differential sticking, this has to be accepted. Also, high overbalance pressures may be unavoidable if they are needed to maintain well control or wellbore stability in other parts of the open hole section. However, mud composition and properties can be modified, within limits, in the prevention of differential sticking.
Differential pipe sticking problems generally result in the significant amount of downtime and remedial costs and well cost overruns and time overruns as a non-productive time in terms of loss of rig days either due to stopping of drilling operations or in an attempt to free the stuck pipe
1.1.3 Freeing stuck pipe
Several approaches have been developed to avoid or prevent stuck pipe, proactive approaches which utilize effective techniques to predict or detect stuck pipe before it occurs one of which is discussed in this literature. However it is important to know measures taken to free stuck pipe when stuck pipe incidences occur i.e. the actions made after the pipe gets stuck.
Pipe sticking is said to be a very bad surprise when drilling because once it occurs it automatically alters every operation and it is impossible to estimate how long it will take to pull out free, it can last for seconds, hours, days or even months and can even cause abandonments depending on the magnitude.
Usually when the pipe suddenly gets stuck, the first action is how to get it free as quickly as possible. Regardless of the cause of sticking, the most common action in drilling industry to free the pipe is to work it out by firing the jars, which are parts of drilling assembly. Jars exert huge amount of energy on drill string, which can be transferred to an impact force that may be able to free the pipe. Depending on the cause of the sticking, jars may be applied downwards or upwards. However, Jars sometimes are ineffective especially when they are placed below stuck point, which can be due to poor estimation of stuck zone or lacking of proper field experience. In addition the hydrostatic pressure can also be reduced by pumping low weight mud/pill, ensuring that the overall hydrostatic pressure is still able to control reservoir fluid from accidentally entering the wellbore. Continue jarring down with maximum trip load and apply torque into drill string.
However if all attempts to free the stuck pipe prove abortive, the next option is to retrieve he stuck pipe using special tools designed for this purpose, this tools are known as Fishing assemblies, they are a wide variety of equipment and tools used in retrieving down hole equipment, BHAs that get lost in the hole.
Depending on their functionality and the requirement in hand, we can classify them as the following:
- External Catch Fishing tools
- Internal Catch Fishing tools
- Junk Catch Fishing tools
- Milling and Cutting tools
Each of the above stated set of tools has their own specifications and are very handy in fishing operations.
1.2 Background of Study
Since the commencement of drilling operation in the petroleum industries stuck pipe has been a common problem with tremendous impact on drilling efficiency and cost among other problems. Industry statistics gathered since 1989 show the relative cost of nonproductive time. Stuck pipe is still the drilling industry’s most costly unscheduled event (SPE, 2013). This occurrence can be said to be caused by different conditions, which have been narrowed down to two categories; mechanical and differential sticking and has been said to have cost the petroleum industry millions of dollars annually.
Different approaches have been adopted in an attempt to reduce the cost and rig time wasted on pipe sticking by predicting the occurrence, analyzing the causes, methods to prevent the occurrence, immediate actions to carry out when differential pipe sticking occurs and even methods of predicting the occurrence of stuck pipe.
Miri et al., (2007) implemented the Artificial Neural Network (ANN) to predict pipe sticking in Iranian Fields, Mustafa Moradi Nehzad et al., (2012), also did a study on a Maroon field were stuck pipe was predicted using the ANN.
Stuck pipe prediction approaches have also been carried out for the Niger Delta fields by M.A Magaji et al., (Shell Petroleum Development Company, 2002), their paper reviewed the implementation of the stuck pipe factor prediction tool which was developed based on prevailing occurrence and existing data, however the tool can only be used to predict the inherent risk of getting stuck in well planning and designing stage.
Therefore, this research study is aimed at predicting stuck pipe using the using the Niger Delta Field as a case study.
1.3 Aims and Objective
This aim of this research project is
To predict occurrence of stuck pipe in the Niger Delta by examining, analyzing drilling parameters gotten from some daily drilling reports within the Niger Delta fields using the Artificial Neural Network.
To achieve this aim, my objectives include to:
Identify, study, analyze and understand the causes the causes of stuck pipe
Analyze the difference between drilling parameters
DISCLAIMER:
All project works, files and documents posted on this website, projects.ng are the property/copyright of their respective owners. They are for research reference/guidance purposes only and the works are crowd-sourced. Please don’t submit someone’s work as your own to avoid plagiarism and its consequences. Use it as a guidance purpose only and not copy the work word for word (verbatim). Projects.ng is a repository of research works just like academia.edu, researchgate.net, scribd.com, docsity.com, coursehero and many other platforms where users upload works. The paid subscription on projects.ng is a means by which the website is maintained to support Open Education. If you see your work posted here, and you want it to be removed/credited, please call us on +2348159154070 or send us a mail together with the web address link to the work, to hello@projects.ng. We will reply to and honor every request. Please notice it may take up to 24 - 48 hours to process your request.